A platform supply vessel had sustained significant damage to its bulbous bow section and needed a full structural renewal to return to Class and back into service. Dales Marine Services was contracted to carry out the repair, first surveying the damage and carrying out minor repairs at our Aberdeen dry dock, before the vessel sailed to our Leith facility, where our dry dock and fabrication capability allowed the full repair to be completed.
What We Did
Once the vessel was dry in Leith, our team erected scaffolding around the damaged area to access and accurately mark up the full extent of the damage. Working from the vessel's original build drawings, we determined the precise steel thicknesses and dimensions needed, then sourced Class-approved steel to match.
The complexity of the bow's curvature meant the new steel had to be formed across two axes rather than simply rolled, a technically demanding pressing process. The replacement section was fabricated in our workshop with internal frames welded precisely into place, so that when offered up against the existing hull plating, every frame and beam would align correctly.
The completed section was lifted into position using our on-site 90-tonne crane. Aside from one small transverse stiffener, which was removed and re-welded at a later stage, every seam and bracket aligned on the first fit, a strong result, given that new-build drawings aren't always exact.
With the new section tacked in place and all joints prepped for full-penetration welding, we put welders on day and night shifts to keep the repair on schedule. All welding was carried out by our GL-DNV coded and regularly tested welders, in line with Dales Marine's own weld procedures.
On completion, the repair was independently verified and closed out with a full documentation pack prepared by our QC department, including:
● 100% MPI and local UT inspection, carried out by an approved third-party NDT company
● Weld procedures and welder qualifications
● Material and welding consumable certificates
● NDT reports
The vessel was repainted to specification and the work was passed by the Classification Surveyor before returning to service.
The Results
Dales Marine delivered a technically complex, two-axis steel renewal that returned the vessel to full Class approval, with the new section aligning correctly against the existing hull on first fit. Running welding across day and night shifts kept the vessel on schedule, minimising the time it spent out of service.