READY FOR FOREIGN WATERS
October 2026
Client
Anonymous
Location
Leith
Client challenge
The client needed a water treatment plant installed on board a vessel heading into foreign waters. The plant had to suit the vessel’s operational profile and work with the services available on board. It also had to produce treated water that met the agreed technical specification and the relevant marine hygiene and environmental requirements.
The new plant had to be integrated safely with the ship’s existing systems, including the seawater intake, freshwater storage, drainage, power supply, controls, alarms and monitoring points. The work needed to be delivered in a structured, auditable way, from installation through to handover.
What we did
Dales Marine delivered the project from start to finish:
- Survey and design confirmation. We confirmed the available footprint, access routes, foundations, pipe runs, drainage, power, ventilation and controls. We also identified any operational constraints, then issued a survey report and an installation design basis.
- Equipment supply. We supplied the full plant package, including the treatment unit, pumps, filters, dosing equipment, control panel, instrumentation, valves, pipework and fittings.
- Mechanical installation. We positioned and secured the equipment on new foundations. We then connected the process pipework, drains, sampling points, isolation valves and bypass arrangements.
- Electrical and controls integration. We connected the power supply, control cabling, alarms, sensors and interlocks, and linked the plant to the vessel’s existing systems.
- Testing and commissioning. We flushed, pressure tested and inspected the system, then energised it. We ran performance checks, verified water quality and proved the alarm and control logic.
- Training and handover. We gave the crew familiarisation training covering operation, maintenance routines and troubleshooting, and recommended spares.
The results
The vessel left ready for foreign waters with a fully commissioned water treatment plant that works seamlessly with its existing systems. Every stage was tested and verified, so the client can be confident the treated water meets the agreed specification and the relevant marine hygiene and environmental requirements. Before handover, we made sure the crew could run and maintain the plant themselves, and we left them with the manuals, drawings and records to back that up. The client now has a reliable supply of clean water on board and a clear audit trail for the life of the system.