Repair work completed on the NVL Pharos

August 2015

The Northern Lighthouse vessel, NVL Pharos, was built by Rementowa of Poland in 2007. The vessel which is 84 meters long, with a 16.5 meter beam, operates as a lighthouse and navigation buoy tender. The vessel docked a Gravel Clyde for 20 days, in July, for pressure hull steelwork repairs and repair work to her conifer, GRP pipe, timber decking and painting.

Interested in working with us?